The company has also added a few feathers to its cap of success, as the following highly specialized projects illustrate  
   
 
Upgradation of the Road from Beeragonahalli near Yediyur (Km 0+000) to Mandya (Km 59+590) of SH-84 in the State of Karnataka on EPC Mode. 2023.19 million  
Upgradation of Road from Saundatti to Ramdurga (including Mullur ghat realignment) (Km 0+000 to Km 37+270) in link 21C and Ramdurga to Halgatti Junction, Ramdurga (Km 0+000 to 3+600) in link 21D in the State of Karnataka on EPC Mode. 1379.85 million to be completed in 24 Months and work is in progress.  
Construction of Roads & Storm Water Drains in Chinchbhuvan and Khapri areas in MIHAN at Nagpur, Maharashtra worth 390.55 million to be completed in 15 months and work is in progress.  
 
     
   
     
     
 
A. Highways & Runways
   
I] BOT (Annuity Projects)
  1] Development and operation / maintenance of Nagda-Gojapur (0+00 to 14.980) Major District Road in the state of M.P. on Design, Build, Finance, Operate and transfer (DBFOT) on Annuity Basis 388.50 million to be completed in 24 months. Work is in progress
   
2] Development of Dinara Datia (MDR) Road on BOT (Annuity) Basis 160.00 million to be completed in 24 months and work is in progress.
   
II] OMT PROJECTS
  3] Operation and Maintenance of Lalitpur-Sagar-Lakhnadone from Km 99.005 to Km 415.089 Section of NH-26 on OMT basis in the States of Uttar pradesh and Madhya Pradesh (package no. 14 (NS)) and Toll Collection is in progress.
     
III] EPC PROJECTS
     
  4] Upgradation of Road from saundatti to Ramdurga (including Mullur ghat realignment) (Km 0+000 to Km 37+270) in link 21C and Ramdurga to Halgatti Junction, Ramdurga (Km 0+000 to 3+6000) in link 21D in the State of Karnataka on EPC Mode. 1279.85 million to be completed in 24 Months and work is in progress.
     
  5] Construction of approaches to major bridge across Puma river on Khamgaon-Jalab- Matargaon- Bhendwal- Niwana road in Buldhana District under Executive Engineer, Public Works Department, Khamgaon, Maharashtra. The scope of work includes Embankment, Sub grade, GSB, WMM & BM, DBM, SDBC & BC & Major Bridge of 100 m Length worth 657.04 million to be completed in 24 Months and work is in progress.
     
  6] Construction of Roads & Storm Water Drains in Chinchbhuvan and Khapri areas in MIHAN at Nagpur, Maharashtra worth 390.55 million to be completed in 15 months and work is in progress.
     
  7] Construction of Entry Road to site / Approach road to Building Zone / Access road to Buildings, at NATRAX, Pithampur, Madhya Pradesh worth 297.11 million to be completed in 12 months and work is in progress.
     
B. Irrigation Projects
   
  8] Construction of Jack well, pumps house and Approach Channel of Tedhava Seoni Lift Irrigation Scheme under Executive Engineer, VIDC, Gondia. The scope of work includes Jack Well, Pump House, Approach Channel & Rising Main of Length 5.50 KM worth 513.77 million to be completed within 36 Months and work is in progress.
 
  9] Construction of Jack well & Pump house, Rising Main & allied works of Palasgaon Amdi Lift Irrigation Scheme. Tah. Ballarpur Dist:- Chandrapur under Executive Engineer, VIDC, Chandrapur. The scope of work includes Jack Well, Pump House, Rising main and allied works worth 276.18 million to be completed within 36 Months and work is in progress.
     
 
 